The factory-to-delivery process
The factory
Explore the production floor. Follow materials into manufacturing, then see how your product is assembled before it leaves the factory.
Confirm who makes the product, where it is made, and whether the equipment and approved sample match your specification.
- A usable product brief
- Set materials, dimensions, tolerances, finish, function, packaging and destination market. Separate must-haves from preferences; state quantity and target timing so suppliers answer the same request.
- Manufacturer identity & capability
- Match the contracting entity to its business documents and production address. Establish what is made in-house, what is subcontracted, which equipment is available and how capacity will be checked. A listing or factory photo alone is not verification.
- Comparable written quotes
- Ask each supplier to quote the same specification and quantity. Separate unit cost, tooling, samples, packaging and transport; record minimum order, payment milestones, lead time, quote validity and exclusions.
- Samples & tooling
- Agree the sample type, cost and revision process. Record the approved sample and specification version; define tooling ownership, storage, maintenance and release arrangements before committing to production.
Buyer approves the specification, sample and commercial terms. The supplier confirms manufacturing scope and timing. Factory & Freight coordination, verification and inspection tasks must be named in the agreed scope.
Quality check
Move to the inspection bench. The reference sample, measurements, function and finish become the checks against which production is reviewed.
Agree the inspection scope and acceptance criteria. Review findings and corrective action before the responsible buyer authorizes release.
- Before production
- Translate the approved sample into measurable checks for dimensions, materials, finish, function and packaging. Name any separate testing needed for the product and destination; a visual inspection does not replace it.
- During production
- Agree which milestones need evidence: materials received, first units, in-process checks and completion. Record changes against the approved specification before a substitution becomes a full production run.
- Before release
- Set the sampling scope, defect criteria and report format in advance. Reconcile inspected quantities, record findings with supporting evidence, and agree rework and reinspection where required.
The inspector reports findings; the supplier addresses agreed defects. The buyer or a named authorized representative makes the release decision against the agreed criteria.
Pack & consolidate
See goods packed, labeled and gathered into shipment-ready pallets. This is where separate production runs can become one coordinated dispatch.
Reconcile the packed quantity to the order and confirm carton markings, packaging protection and receiving requirements.
- Packing specification
- Define unit protection, inner and outer cartons, SKU and batch markings, pallet format and receiving labels. Confirm packaging against the product, route and destination warehouse requirements.
- Receive & reconcile
- Count units and cartons against the order and packing list. Record visible damage or shortages on receipt, keep batches identifiable and resolve discrepancies before combining supplier consignments.
- Measure the final shipment
- Record actual packed dimensions, gross weights, carton count and any handling restrictions. Freight estimates should be reviewed against these final measurements before booking.
The supplier supplies correctly marked goods and packing data. The receiving warehouse records condition and quantity; the booking party uses the confirmed shipment details.
Export hub
Follow the goods into the export terminal. Pickup, cargo handling and the booking need to agree before the main transport begins.
Confirm cargo readiness, booking details, document cutoffs and who handles the handover at origin.
- Pickup readiness
- Confirm the collection address, cargo-ready date, contact, loading access and goods available for release. A planned completion date is not evidence that packed cargo is ready.
- Booking & cutoffs
- Check the booked service, departure point, cargo and document deadlines, and terminal or forwarder receiving instructions. Reconfirm the plan when production or pickup timing changes.
- Export documents
- Reconcile product descriptions, quantities and weights across the invoice, packing list and transport instructions. Name the party preparing export records and resolving discrepancies.
Allocate pickup, loading, origin handling and export responsibilities in writing. Record where custody changes and who is contacted if cargo or paperwork misses the agreed cutoff.
International freight
Switch between sea and air to explore the physical journey. Cargo size, delivery needs and the complete charge breakdown determine the appropriate service.
Compare the whole shipment scope, including local charges and delivery. A mode selection here is a planning preference, not a freight quotation.
- Service fit
- Use actual cargo dimensions, weights, product restrictions and required delivery timing to compare sea and air. Ask which legs and connections are included and what timing is estimated.
- Written cost breakdown
- Separate origin handling, main carriage, destination charges and final delivery. Identify exclusions, quote validity, possible storage costs and the assumptions that can change the total.
- Risk & exceptions
- Agree cargo insurance scope and exclusions where required. Define who receives movement updates, handles a delay, and submits evidence if loss or damage is reported.
The buyer approves the quoted scope. The booking party confirms the carrier or forwarder service and handover references; transport selection in this explorer makes no booking.
Customs
Explore the inspection and clearance handover. The goods and their documents must tell the same story before onward transport is arranged.
Identify the importer and the appointed clearance provider. Confirm product information and destination requirements for the actual goods.
- Product information
- Provide a clear description, composition, intended use and value for the actual goods. Ask the appointed clearance provider to confirm the information and supporting records needed.
- Responsible parties
- Identify the importer and clearance provider before dispatch. Confirm who supplies instructions, pays assessed charges and resolves a request for additional information.
- Document reconciliation
- Check that the invoice, packing list and transport reference describe the same shipment. Escalate missing or conflicting records before they become a clearance delay.
The importer and appointed clearance provider confirm the destination process. Supplier and logistics parties supply the agreed records; this illustration is not a clearance approval.
Final delivery
Follow the truck to the receiving warehouse. Delivery appointments, unloading equipment and receiving checks complete the physical handover.
Confirm the delivery address, appointment, unloading responsibilities and the process for reporting shortages or damage.
- Access & appointment
- Confirm the final address, receiving hours, appointment process, vehicle restrictions and unloading equipment. Include these requirements in the delivery scope before dispatch.
- Receiving checks
- Count delivered cartons or pallets, note visible condition and reconcile against the packing list. Keep delivery records and photographs where relevant to a discrepancy.
- Shortage or damage
- Agree how the receiver reports an issue, who investigates and which records are needed. Refer to the applicable provider terms for notification requirements.
The delivery provider completes the agreed transport; the receiver documents condition and quantity. Name the party responsible for unloading, discrepancy follow-up and final acceptance.
World routes
Rotate the globe and change the destination to see an indicative connection from the China sourcing origin to your selected market.
These arcs illustrate origin and destination. Actual ports, airports, stops and carrier routes are confirmed when the shipment is scoped.
- Start with the factory
- Use the confirmed production and pickup address when planning inland transport. A sourcing city or broad region is not enough to establish the origin leg.
- End with the receiver
- Specify the destination country, delivery address and warehouse requirements. The destination market alone does not define clearance, local handling or final delivery.
- Confirm the connections
- Ask the booking party to confirm the actual ports or airports, transfers, service and scope. Globe arcs show a representative connection, not carrier routing or current cargo position.
The buyer supplies destination and timing needs. Supplier, forwarder and receiver confirm their locations and responsibilities before the route and delivery scope are agreed.
Start a sourcing inquiry →Enable JavaScript to rotate the scenes and customize your brief.